中文English
1. High power, low power consumption, faster chargingStar charging 180kW dual gun DC integrated machine, is the latest high-power fast charging pile, the maximum output current is...

180kw fast charge OK?

1. High power, low power consumption, faster charging

< br >

Star charging 180kW dual gun DC integrated machine, is the latest high-power fast charging pile, the maximum output current is 2*250A (single gun 250A), under the same power conditions, compared with 200-750V products on the market, to the passenger car (battery voltage 250-380V) charging faster, peak charging efficiency of 96%, The standby power consumption of the power module is 0, and the standby power consumption of the whole machine is less than 50W, which greatly saves the charging cost and truly achieves high efficiency and low power consumption during charging.

< br >

2. Multi-module intelligent scheduling, strong applicability of ultra-wide voltage

< br >

The integrated structure of multi-module intelligent scheduling makes the application range of 180kW dual-gun DC integrated machine wider. 200V~1000V ultra-wide output voltage range, support all electric vehicle charging in line with the national standard on the market, to meet the needs of public transport, logistics vehicles, taxis, sanitation vehicles, passenger cars and other charging operations, even if the future vehicle battery voltage increases to 920V is still applicable, to avoid repeated investment, greatly saving costs.

< br >

3, the appearance level upgrade, high-definition touch screen, more friendly interaction

< br >

It is worth mentioning that 180kW dual-gun DC all-in-one machine has become the star charging \"appearance level play\

< br >

4. Gun line grab design upgrade, female users can easily operate

< br >

This charging pile is designed to move the gun line up and grab the support down, so that female users can easily start to operate, grab the support part of the new activity buckle design, the user can roughly aim when the gun is charged, no need to carry the heavy gun line accurately inserted.

< br >

5, intelligent heat dissipation, noise control

< br >

The intelligent cooling system is also upgraded, and the cooling fan frequency conversion speed regulation can be adjusted according to different environmental temperatures and different application scenarios, with controllable noise and stronger environmental protection.

< br >

6, cloud Internet active prevention and control, charging more secure

< br >

The 180kW dual-gun DC all-in-one can realize cloud interconnection and is suitable for remote OTA control. Star charging intelligent operation and maintenance platform real-time detection, control and protection of each charge, including operating status monitoring, fault monitoring, charging metering, charging process remote control and other functions, active operation and maintenance, more intelligent, safer, to bring new energy owners a new charging experience


Yes. Solve the problem of difficult charging and long charging time. It has always been a pain point in the use of new energy vehicles. With the increase in the number of charging piles, the difficulty of charging has been alleviated, but the complaints of new energy owners about the long charging time have not decreased.

This is also the reason why new energy owners prefer high-power charging piles, high-power often means faster charging speed, which can help owners reduce charging time.

Especially for users of commercial vehicles, online car hailing, taxis and other operating vehicles, the time saved is almost equivalent to \"real money\".