The first step: Contact the property company to determine the residential charging pile installation policy. At present, for the installation of charging piles, the general regulation is to require its own property rights. In addition, due to the early construction of some properties, it is not suitable to install charging piles, if the installation of charging piles requires additional technical equipment investment, be sure to communicate with the property in advance.
Step 2: Check your parking space. This kind of inspection means that the owner goes to the site himself, and this step is very important to save costs. A general community will have a lot of power distribution room, the owner to choose their own - the closest to the parking space, so that when the installation can save a lot of costs.
Step 3: Provide relevant materials. The copy of the ID card, the parking space property rights certificate (can be issued by the property), the property agreed to the installation instructions to the staff, the current Beijing electric power company only accepts the application of the charging pile company, the owner can not apply for themselves.
Step 4: Go on a field trip. The engineer of the power company will notify the charging pile company - at that time, the property electrician, the charging pile company, the power company and the owner will be on site to determine the final construction plan.
Step 5: Install. After determining the construction plan, it is the step of installation and construction, according to the different conditions of the community and the location of the garage, the construction time is different, some only need 2 hours to finish, and some may need a whole day to complete the construction.
Step 6: Acceptance. After the construction is completed, the charging pile company will report to the power company, and the power company will go to the site for acceptance, and the acceptance will impose a seal on the meter, and then the power company will make the corresponding electricity card, and the charging pile company will receive it to the owner, or the owner will go to the power supply device to receive it.