First: parking space property rights or use rights certificate and property consent certificate, this must have. The original property certificate will be taken away.
Second: booking contract, invoice, or a copy of the driving permit. Simply put, it is a contract stamped with the official seal of the new energy vehicle sales qualification enterprise.
Third: the original and copy of the identity card of the owner of the parking space. (Both persons with joint property rights should bring.)
Fourth: Charging pile installation commitment, my property and I said that this is the city's unified, I do not know whether it is deceptive, need to cover four seals in the car, respectively, where the sales enterprise and charging pile installation enterprise.
Fifth: Mobile phone download the official APP of the State Grid, palm power. And real-name registration system.
Then take the mobile phone with the palm power, and the information indicated above, go to the nearest State grid business hall to do the formalities, soon there will be staff contact the investigation site, conditional directly from the power grid substation, no conditions can only enjoy the high price of the property.
Generally within 300 meters can be directly connected to the substation room. Each increase of 100 meters, the cable diameter is best to improve a specification, according to 7kw charger, 6 square meters within 100 meters, 10 square meters of 100-200 meters, and 16 square meters of 200-300 meters. It has nothing to do with safety, mainly to reduce pressure drop and improve the efficiency and economy of long-term operation.
1, the owner fill in the new energy tram charging pile installation application registration form.
2. If it is installed in the community, it is necessary to report to the property in the community to confirm the use of the parking space, and then let it stamp on the registration form for the installation of the charging pile.
(3) If the residence is in the street or community, the neighborhood committee of the street or community will stamp the registration form to confirm the use of the parking space; If the charging pile is applied at the work place, the owner's unit needs to confirm the use of the parking space, and then stamp on the registration form.
4. After the new energy tram sales enterprise confirms that it has built a charging pile for the user, it seals the charging pile installation application registration form.
5, the car host charging pile installation application registration form, the original ID card, parking site environment photos and parking certification materials to apply for the power supply department of the area proposed power license.