What is the heating pipe support installation specification1, when the gas pipeline bracket is installed, there will be a spacing requirement, and the maximum spacing needs to be d...

Pipe heating pipe support spacing specification?

What is the heating pipe support installation specification

< br >

1, when the gas pipeline bracket is installed, there will be a spacing requirement, and the maximum spacing needs to be determined according to the nominal diameter. If the heating pipe with a nominal diameter of 15 mm is selected, the distance of the insulation pipe is about 2 mm, and if it is not insulated pipe, it is about 2.5 mm.

< br >

2, if the selection is 25 mm specifications, the maximum spacing of the support should be set between 2.5 mm and 3.5 mm. If the diameter of the selected pipe is relatively large, such as up to 100 mm, the maximum spacing of the support should be expanded relatively, between 4.5 and 6.5 mm.

< br >

3, different heating pipe materials, the distance between will be different, such as plastic pipe or copper pipe will have different provisions. In addition, if the height of the floor is less than 5 meters, each floor needs to install a bracket, if more than 5 meters, each floor can not be less than two brackets.

< br >

4. The height of the pipe support installation is generally between 1.5 and 1.8 mm from the ground, which needs to be installed at the same height, and the clamp should be fixed on the load-bearing structure.


The space between heating pipe supports must be installed according to related specifications.
According to the \"Building water supply and drainage and heating engineering design Code\


According to the specification, the spacing of heating pipe brackets should meet the following standards: the horizontal pipe distance shall not exceed 2 meters, the vertical pipe distance shall not exceed 1.5 meters, and the larger the diameter of the pipe, the smaller the spacing of the brackets.
This ensures the stability and safety of the pipeline during use.
In addition, in order to avoid the stretching or shrinking of the pipeline due to temperature changes, it is also necessary to set up \"expansion joints\" at both ends of the pipeline to avoid the pipeline from being ruptured by excessive pressure and damaging safety facilities.
In short, the Settings can ensure the safe use of pipelines and reduce the probability of accidents, which is a requirement to be observed.


The space between heating pipe supports should comply with the regulations. The pipes in the pipe trench may be affected by groundwater pressure and earthquakes. If the space between pipe supports is too large, the pipes may be bent or deformed due to their own weight, which damages the sealing of the pipes and leads to energy loss.
According to the relevant specifications, when installing pipe supports, the distance between pipe supports should be reasonably set according to the pipe diameter, material and laying length, etc., to ensure the stability and safety of the pipeline during operation.
In addition, in order to increase the stability of the pipe support and prevent the resonance of the pipe during operation, rubber pads or shock absorbing materials can be installed on the pipe support.
In addition, if the energy consumption of the pipeline is large, the distance between the pipe brackets should be appropriately reduced to control the vibration and energy loss of the pipeline.


The specifications of heating pipe support spacing may be different according to different countries and regions, the following are some common specifications:
1. USA: When installing heating pipe brackets on the wall or ceiling, the spacing should not exceed 6 feet. 2. United Kingdom: When installing heating pipe supports on the wall or ceiling, the spacing should be determined according to the diameter of the pipe and the pipe material, generally not more than 3 meters. 3. Europe: When installing heating pipe supports on the wall or ceiling, the spacing should be determined according to the diameter of the pipe and the pipe material, generally not more than 2 meters. 4. China: When installing heating pipe supports on the wall or ceiling, the spacing should be determined according to the diameter of the pipe and the pipe material, generally not more than 1.5 meters.
It should be noted that the above specifications are for reference only, and the specific distance between pipe heating pipe supports should be determined according to the actual situation and relevant local regulations.


2 Because the pipe bracket is one of the important facilities responsible for fixing the heating pipe, the bracket spacing not only affects the stability and service life of the pipe, but also involves the efficiency and safety of the entire heating system.
The bracket spacing set in accordance with the specification can fully ensure the stability and safety of the pipeline, but also effectively reduce the friction loss and heat loss of the pipeline, and improve the thermal efficiency of the heating system.
3 According to the relevant specifications and standards, the spacing of heating pipe brackets should be between 1.5 meters and 2.5 meters, and the specific setting should be determined by the diameter, thickness, material, laying method, environmental conditions and other factors.
In addition, it is also necessary to strengthen the selection, installation, adjustment and maintenance of the support to ensure the normal operation and safety of the heating system.


The space between heating pipe supports should comply with relevant specifications.
The reason is that the spacing of heating pipe brackets does not meet the specifications, which is easy to cause problems such as unstable installation, leakage, damage, etc., which seriously endangers the safe operation of the heating system.
The spacing of heating pipe supports varies according to different specifications. You need to select a suitable specification for installation according to the actual situation.
In addition to the distance between the heating pipe brackets, other factors need to be taken into account when installing the heating system, such as pipe diameter, material, installation method, etc. Reasonable installation and maintenance can ensure the normal operation of the heating system and reduce the cost of future repair and replacement.