There are Huada nine days, Obit, Shentong subway, State network communications, Chenming Paper, Kangli elevator and so on.
State Network Information: The company has complete infrastructure, built the most advanced EDA development environment and the domestic first-class chip reliability and failure analysis laboratory.
Orbit: May 26, 2020 Interactive platform Reply: The company's integrated circuit EDA design platform mainly includes three parts: hardware design platform, software design platform and chip verification platform.
Shentong Metro: Indirectly participates in Huada Jiutian, which is the largest EDA leading enterprise with the strongest technical strength in China.