First, whether there are installation conditions
< br >
Before installing the charging pile, the user needs to investigate whether the parking space has the installation conditions, and the key problem is whether the parking space can be connected to the national grid line. The most direct and effective way is to communicate with the property, and the property will simply understand some situations, such as occupied area, installation plan, electricity demand and so on.
< br >
Second, understand the property of power supply in the community
< br >
Some districts can directly take the electricity of the national grid, and some districts are the use of commercial electricity, and these two kinds of electricity have their advantages and disadvantages.
< br >
The charging pile is powered by ordinary residential electricity, which is more complicated, and requires users to apply for power supply box wiring, after approval, the State grid will arrange staff door-to-door wiring, the price is relatively cheap, and it is generally the price of ordinary residential electricity.
< br >
If the commercial electricity in the community is used, the price will be much higher than the civil electricity, but its advantage is that the process is relatively simplified, and the power can be directly negotiated with the property.
< br >
Third, understand the type of charging pile
< br >
Generally, it is necessary to determine the type of charging pile installation according to the conditions of their own charging pile installation.
< br >
At present, household charging piles are roughly divided into wall-mounted and column types. The advantage of wall-mounted is that it saves space and is cheap, but it can only be installed on the wall that can be wired. Although the column type will occupy a relatively large space and the price is relatively high, it does not have too many limitations on the installation location. Therefore,
Users can choose according to their own pile installation conditions.
< br >
From the application for installation of private charging piles to the actual use of charging piles, it is roughly necessary to carry out three steps, namely submission of application, review of materials and installation and construction.
1, confirm that they have the conditions to install charging piles, and then apply for the installation of electricity meters;
< br >
2, with the relevant information, namely ID card information, fixed parking space property certificate, charging pile instructions, etc., to the local power supply bureau to apply for installation of meters;
< br >
3, after the staff review and approval, will fill in the \"customer cable application\
< br >
4, through the official website or related APP, contact the after-sales personnel and put forward the application for installing the charging pile, in the application need to upload the meter installation picture, as well as the property license certificate materials.
< br >
5, after the above steps are completed, the installation master will come to the door to install the charging pile.